| 6. Construction Phase |
| a) | Chassis, Brakes & Suspension Clean chassis: media blast, acid dip, etc. Inspect & repair as necessary Paint chassis and components Assemble components incl. wheels & tires Install brake and fuel lines Install fuel tank (mid-year) | | | | |
| b) | Engine & Drivetrain Install engine accessories (alt; A/C, headers, etc.) Install engine, transmission, driveshaft and differential in chassis Build & install exhaust system Connect fuel lines | | | | |
| c) | Bodywork, Components & Painting Strip old paint (media blast, chemical, etc.) Complete body work and repairs Prime and paint body Install body wiring systems Install weatherstripping Install door, windshield and other glass Install stainless trim components Drop body on Chassis Install radiator and cooling system plumbing Install fuel tank, cover & filler/vent lines (C1) Install & align doors, trunk, hood, etc. Connect electrical wiring Install headlight, tail lights, etc. Install wiper system Install braces, bumpers, grille, emblems Install battery | | | | |
| d) | Interior Components Install dash, gauges, switches, steering column, insulation Install carpeting (consider heat barrier) Install interior trim, headliner, seats, seatbelts | | | | |
| e) | Miscellaneous State Inspection Registration Insurance Systems operations testing Road test | | | | |
| Hit the road and enjoy your efforts! |
This snippet demonstrates how we organize our project plan.